Investment theme

AI Power & Critical Minerals

Data centres need round-the-clock power, grid connections and the minerals that wiring, magnets and fuel are made of, and new supply of each takes years to build.

Evidence
Gaining support
Cycles
Tailwind
Valuation
Close to its own past
Leadership
Lagging
Companies
10 tracked · 2 with warnings

Companies riding it

10 tracked
CompanyZoneValuation vs own historyWarningsThemes
VST Vistra Corp. Reference None 1
CEG Constellation Energy Corp Above reference None 1
VRT Vertiv Holdings LLC Above reference None 2
BE Bloom Energy Corp Above reference None 1
EQT EQT Corp Re-underwrite / risk Reference Revenue decline 1
DNN Denison Mines Corp. Its financial statements are not filed in a form we measure — None 1
FCX Freeport-mcmoran Inc Above reference — None 1
GEV GE Vernova Inc. No usable valuation history — None 1
USAR USA Rare Earth, Inc. Re-underwrite / risk Too little reported history, No usable valuation history — Heavy dilution 1
UUUU Energy Fuels Inc Deep discount — None 1

Also in the theme, not tracked here: CCJ, LEU, BWXT, TLN, OKLO, ETN, PWR, WMB, MP, SCCO.

Leadership: Its companies have trailed the tracked companies as a whole, and still do. It describes how the shares have traded, not where they go next.

Zones and valuation are measurements against each company’s own history, not buy or sell instructions. See them on the stocks list →

Narratives that test it

Gaining support
  1. Power constraints are slowing data-centre expansion

    Supports the theme if it holds · Recent evidence supports the theme

    Also tests AI platforms, which it challenges if it holds.

    Evidence increasingly supports the claim as power constraints produce direct financial consequences. NextDC's lowered guidance shows that connection delays and local opposition can directly impair facility timelines and operator earnings, confirming grid friction extends beyond US regional queues. While hyperscalers are funding on-site generation like fuel cells to circumvent backlogs, localized grid and community barriers remain binding. The open question is whether off-grid power can be deployed fast enough to prevent project deferrals.

    Latest development: On October 21, 2026, Australian data centre operator NextDC cut its earnings forecast, triggering a 40% drop in its share price, after facing power supply delays and local community opposition at its Melbourne facility.

  2. Nuclear power is being revived to run data centres

    Supports the theme if it holds · Recent evidence supports the theme

    Securing multi-year fuel supply for Oklo's planned reactors at Meta's Ohio campus directly strengthens the claim by linking nuclear fuel contracting to hyperscaler power demand. Paired with BWXT's manufacturing expansion, it shows the commercial supply chain mobilizing for advanced reactors alongside recent regulatory approvals. However, these agreements remain tied to future builds that have yet to produce commercial power. As recent delays at Darlington demonstrate, modular nuclear projects still face substantial execution and schedule risks.

    Latest development: On November 13, 2026, Centrus and Oklo finalised multi-year fuel agreements for up to five Aurora reactors at a 1.2 GW Meta campus in Ohio. That same day, BWX Technologies finished a $56 million expansion of its Ontario plant to build components for conventional and advanced nuclear reactors.

  3. Western critical-mineral supply chains are being rebuilt

    Supports the theme if it holds · No recent evidence

  4. Data-centre power demand is falling short of forecasts

    Challenges the theme if it holds · Too little evidence yet

    The sharp reduction in PJM's planned backstop procurement—potentially shrinking by over 90% to 630 MW as regional utilities trim large-load forecasts—provides initial evidence that speculative data-centre interconnection requests are being weeded out. This tempers recent bullish disclosures from utilities such as AEP and FirstEnergy, which reported surging long-term pipelines. The central open question is whether these downward revisions reflect genuine cancellations and efficiency gains, or simply adjustments while compute demand grows.

    Latest development: On November 3, 2026, Jefferies analysts reported that planned backstop generation procurement in PJM Interconnection could drop from 6,800 MW to as little as 630 MW after regional utilities lowered their large-load forecasts.

  5. Rising power bills are turning regulators against data centres

    Challenges the theme if it holds · No recent evidence